{
  "url": "https://openlegislation.uk/caledonian-maritime-assets-limited-largs-harbour-revision-order-2008/schedule-3",
  "json_url": "https://openlegislation.uk/caledonian-maritime-assets-limited-largs-harbour-revision-order-2008/schedule-3.json",
  "legislation": "ssi/2008/182",
  "legislation_title": "The Caledonian Maritime Assets Limited (Largs) Harbour Revision Order 2008",
  "legislation_url": "https://openlegislation.uk/caledonian-maritime-assets-limited-largs-harbour-revision-order-2008",
  "path": "schedule/3",
  "kind": "schedule",
  "number": "3",
  "heading": "WORKS",
  "text": "Work No 1\nDemolition of the existing masonry pier to a level of 4 metres below Chart Datum commencing at reference point NS 20039 59493 and terminating at reference point NS 20048 59537.\nWork No 2\nA new pier of solid construction comprising steel sheet piled walls with a concrete deck the centre line of which commences at reference point NS 20080 59472 and extends at a deck width of some 15.5 metres in a west north westerly direction for a distance of 71 metres or thereby thence at a deck width of some 13.2 metres in a north north–easterly direction for a distance of 73 or thereby metres and terminating at reference point NS 20038 59553.\nWork No 3\nDredging of the sea bed to a level of 4 metres below Chart Datum with side slopes at a gradient of 1 vertical to 6 horizontal within the shaded area shown on Sheet 4 of the deposited plans.\nWork No 4\nRock armour to the side slopes of the dredged area of Work No 3 to protect the existing shore commencing at reference point NS 20077 59435 and terminating at reference point NS 20060 59440.\nWork No 5\nRock armour to the side slopes of the dredged area of Work No 3 to protect the existing shore commencing at reference point NS 20093 59480 and terminating at reference point NS 20084 59490.\nWork No 6\nRock armour to the side slopes of the dredged area of Work No 3 to protect the existing shore commencing at reference point NS 20114 59545 and terminating at reference point NS 20098 59536.\nWork No 7\nSteel sheet piling around the outside of the existing slip to protect the slip against scour following the dredging of Work No 3 which commences at reference point NS 20104 59482 and extends in a north westerly direction for a distance of 14 metres to reference point 20094 59493 thence in a north easterly direction for a distance of 15 metres to reference point 200106 59502 thence in a south easterly direction for a distance of 11 metres terminating at reference point NS 20113 59494.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ssi/2008/182/schedule/3",
    "retrieved_at": "2026-10-28T22:07:06.192802+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}