{
  "url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-10",
  "json_url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-10.json",
  "legislation": "uksi/2025/452",
  "legislation_title": "The Cambridge Waste Water Treatment Plant Relocation Order 2025",
  "legislation_url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025",
  "path": "schedule/10",
  "kind": "schedule",
  "number": "10",
  "heading": "LAND IN WHICH ONLY NEW RIGHTS ETC MAY BE ACQUIRED",
  "text": "(1) Number of plot shown on land plans\n(2) Purpose for which rights may be acquired and restrictive covenants may be imposed\n012c, 012i, 012j, 012k, 012l, 014a, 021a, 021o, 021q, 021v, 021w, 022h, 022i, 036e, 036f, 038d\nWaste Water Treatment Plant Permanent Access Rights\nAll rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of the authorised development to pass and re-pass on foot, with or without vehicles, plant, machinery, apparatus, equipment, materials, contractors and personnel (including to lay any surface) at all reasonable times (and in an emergency at any time).\n012j, 014a, 021a, 021j, 021m, 021o, 022i, 026a, 029a, 039c, 042d, 044d, 047d, 050a, 056d\nWaterbeach Pipeline Permanent Access Rights\nAll rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of that part of the authorised development comprised in Work Nos. 33, 34, 35 and 36 (collectively referred to as the ‘Waterbeach Pipeline’) to pass and re-pass on foot, with or without vehicles, plant, machinery, apparatus, equipment, materials, contractors and personnel (including to lay any surface) at all reasonable times (and in an emergency at any time).\n005d, 005e, 005f, 005g, 008b, 008c, 008e, 008g, 012b, 012c, 012d, 012e, 012f, 012g, 012i, 012k, 012l, 013b, 013d, 013j, 013l, 015b, 015d, 017b, 018b, 019e, 020c, 021d, 022e, 027b, 027d, 027e, 028a, 031d, 032b, 032d, 032e, 032f, 034d, 036c, 036e, 039a, 042a, 044a, 046a, 046b, 047a, 051a, 052a, 053a, 054a, 055a, 056a, 057a, 058a, 059a, 060a, 060b, 061a, 062a, 063a, 064a, 065a, 066a, 068a, 069a, 070b, 071b, 071c, 071d, 072a, 072b, 074c\nWaterbeach Pipeline Rights\nAll rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of that part of the authorised development comprised in Work Nos. 33, 34, 35 and 36 (collectively referred to as the ‘Waterbeach Pipeline’) including to—\ninstall, connect, retain, use, maintain, inspect, alter, adjust, remove, refurbish, repair, reconstruct, replace, improve, test, commission, cleanse, protect, manage, remove, decommission or render unusable, underground pipelines, and other associated infrastructure including but not limited to Accessories as defined in section 219 (general interpretation) of the Water Industry Act 1991, access chambers, shafts, pipework fittings and fixtures, tunnels, air valves, manholes, marker posts, telemetry infrastructure, communication and control infrastructure, monitoring apparatus, signage, and any other works as necessary;\npermit the free flow and passage of foul water and other material through the Waterbeach Pipeline;\ndecommission redundant infrastructure;\nenter, and be on the land and remain with or without plant, vehicles, machinery, apparatus and equipment for all purposes in connection with the authorised development;\npass and re-pass with or without vehicles, plant machinery, apparatus, equipment and materials (and to lay any surface) for all purposes in connection with the authorised development;\nbreak up the surface of the land, make all necessary excavations (including using horizontal directional drilling technique or open cut trenching) and to carry out reinstatement works;\ncarry out diversion works to existing utilities, to alter or relocate existing utilities connections and to make new utilities connections;\ncross existing infrastructure including the A14, Horningsea Road, Fen Road, the river Cam, the King’s Lynn railway line and drainage ditches, including through techniques such as pipe-jacking or horizontal directional drilling technique;\ncarry out mud and soil handling, ground re-profiling and vegetation clearance;\ncarry out dewatering, temporary construction, commission drainage, restoration of existing land drainage and discharge into any drain or watercourse;\nstore and stockpile materials (including excavated material);\nerect, create and remove fencing and secure works compounds including temporary drilling and tunnelling compounds, drilling launch and exit pits, welfare, storage and laydown areas, temporary haul roads, and working areas;\nplace, construct, use and remove plant, machinery and temporary structures in, on or over the land including any necessary temporary bridging of water courses including bailey bridges;\nsupport the Waterbeach Pipeline from the subjacent and adjacent land and soil including minerals of the owner;\neffect permanent or temporary access to the highway;\nmake such investigations in or on the land as required and to take samples of any materials;\nlay out temporary accesses for public use;\nerect and maintain markers indicating the position and extent of the construction area or the position of the Waterbeach Pipeline;\nexecute and thereafter use, inspect, maintain, adjust, alter, renew, repair, test and cleanse within the land such works as may be reasonably necessary to provide appropriate drainage due to the Waterbeach Pipeline together with a right to enter on to the land for the purposes of exercising the rights;\nlocate, install and inspect chambers, air valves or manholes within or on the land;\nremove fences or walls within the land during any period during which construction, maintenance, repair or renewal is being carried out (subject to erection of any temporary stock-proof fencing as is reasonably required and the re-instating of the original fences or walls following the exercise of the rights);\ninstall, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation, environmental or ecological mitigation works, including temporary works;\ninstall, execute, implement, retain, repair, improve, renew, remove, relocate, fell, trim, lop or plant trees, bushes, woodlands, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect, and replant such tree, shrubs and landscaping;\ncarry out such works or ancillary works required by a planning permission and/or consent now or to be granted over the land, or in accordance with any necessary licences, including but not limited to water abstraction, water discharge, protected species and/or wildlife; and\ncarry out any Further Works as defined in Schedule 1 of this Order.\n005d, 005e, 005f, 005g, 008b, 008c, 008e, 008g, 012b, 012c, 012d, 012e, 012f, 012g, 012i, 012k, 012l, 013b, 013d, 013j, 013l, 015b, 015d, 017b, 018b, 019e, 020c, 021d, 022e, 027b, 027d, 027e, 028a, 031d, 032b, 032d, 032e, 032f, 034d, 036c, 036e, 039a, 042a, 044a, 046a, 046b, 047a, 051a, 052a, 053a, 054a, 055a, 056a, 057a, 058a, 059a, 060a, 060b, 061a, 062a, 063a, 064a, 065a, 066a, 068a, 069a, 070b, 071b, 071c, 071d, 072a, 072b, 074c\nWaterbeach Pipeline Restrictive Covenant\nAll restrictions necessary over the land to prevent activities which are likely to cause damage or injury to that part of the authorised development comprised in Work Nos. 33, 34, 35 and 36 (collectively referred to as the ‘Waterbeach Pipeline’) or to obstruct, interrupt or interfere with the exercise of the Waterbeach Pipeline Rights, the free flow and passage of foul water or other material through the Waterbeach Pipeline, or render access to it more difficult or expensive, including—\nthe building, construction, erection or installation of any permanent building or structure or any work of any kind requiring foundations, footings or other supporting structures;\nthe withdrawal of lateral or vertical support from the Waterbeach Pipeline;\nany activities which increase or decrease ground cover or soil levels or change the composition of the land in any manner whatsoever;\nthe undertaking of piling or percussive works, or works of excavation or mining;\nthe planting of trees or shrubs other than shallow rooting shrubs permitted by the undertaker; and\nthe erection, construction, or laying in or upon the land any pipes, wires, cables, conduits, posts, poles, timber, stone or materials or substance (except fences constructed with such gates or openings as may admit of the free exercise of the Waterbeach Pipeline Rights),\nwithout the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed activities, building, erection, construction or works would not cause damage to the relevant part of the authorised development nor make it materially more difficult to access or maintain the authorised development).\n058e\nWaterbeach Pipeline Permanent Drainage Rights\nAll rights necessary for the purposes of or incidental to the carrying out of dewatering, temporary construction, commission drainage, restoration of existing land drainage and discharge into any drain or watercourse.\n005f, 005g, 005j, 008b, 008e, 009a, 010a, 011a, 012b, 012e, 012k, 012l, 013b, 013c, 013e, 013h, 013j, 013k, 015b, 015c, 015e, 015f, 016a, 017c, 017d, 018c, 018d, 019c, 019d, 020b, 021f, 021h, 021m, 021n, 021o, 021u, 021w, 022c, 022d, 027b, 027c, 027d, 032b, 032c, 032e, 034c\nTransfer Tunnel Restrictive Covenant\nAll restrictions necessary over the land to prevent activities which are likely to cause damage or injury to that part of the authorised development comprised within Work No. 27 (referred to as “the Transfer Tunnel”), or to obstruct, interrupt or interfere with the free flow and passage of foul water or other material through the Transfer Tunnel, or render access to it more difficult or expensive, including—\nthe building, construction, erection or installation of any permanent or temporary building or structure or any work of any kind requiring foundations, footings or other supporting structures;\nthe laying in the land of any pipes, wires, cables or conduits;\nthe withdrawal of lateral or vertical support from the Transfer Tunnel;\nany activities which increase or decrease ground cover or soil levels or change the composition of the land in any manner whatsoever; and\nthe undertaking of piling or percussive works, or works of excavation or mining,\nwhich may not be carried out at any time within a primary restriction zone, but for which the consent in writing of the undertaker may be sought for the carrying out of such activities within a secondary restriction zone (such consent not to be unreasonably withheld or delayed if the proposed activities, building, erection, construction or works would not cause damage to the relevant part of the authorised development).\n034e, 038c\nFinal Effluent and Storm Pipeline Rights\nAll rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of that part of the authorised development comprised within Work No. 31 (referred to as “the Final Effluent and Storm Pipeline”) including to—\ninstall, connect, retain, use, maintain, inspect, alter, adjust, remove, refurbish, repair, reconstruct, replace, improve, test, commission, cleanse, protect, manage, remove or render unusable, underground pipelines, and other associated infrastructure including but not limited to Accessories as defined in section 219 of the Water Industry Act 1991, access chambers, manholes, marker posts, telemetry infrastructure, communication and control infrastructure, monitoring apparatus, signage, and any other works as necessary;\npermit the free flow and passage of final effluent, stormwater and other material through the Final Effluent and Storm Pipeline and to discharge from it into the river Cam;\ndecommission existing redundant infrastructure;\nenter, and be on the land and remain with or without plant, vehicles, machinery, apparatus and equipment for all purposes in connection with the authorised development;\npass and re-pass with or without vehicles, plant machinery, apparatus, equipment and materials (and to lay any surface) for all purposes in connection with the authorised development;\nbreak up the surface of the land, make all necessary excavations (including using horizontal directional drilling technique or open cut trenching) and to carry out reinstatement works;\ncarry out mud and soil handling, ground re-profiling and vegetation clearance;\ncarry out dewatering, temporary construction, commission drainage, restoration of existing land drainage and discharge into any drain or watercourse;\ncarry out diversion works to existing utilities, to alter or relocate existing utilities connections and to make new utilities connections;\nstore and stockpile materials (including excavated material);\nerect, create and remove fencing and secure works compounds including temporary drilling and tunnelling compounds, drilling launch and exit pits, welfare, storage and laydown areas, temporary haul roads, and working areas;\nplace, construct, use and remove plant, machinery and temporary structures in, on or over the land including any necessary temporary bridging of water courses including bailey bridges;\nsupport the Final Effluent and Storm Pipeline from the subjacent and adjacent land and soil including minerals of the owner;\neffect permanent or temporary access to the highway;\nmake such investigations in or on the land as required and to take samples of any materials;\nlay out temporary accesses for public use;\nerect and maintain markers indicating the position and extent of the construction area or the position of the Final Effluent and Storm Pipeline;\nexecute and thereafter use, inspect, maintain, adjust, alter, renew, repair, test and cleanse within the land such works as may be reasonably necessary to provide appropriate drainage due to the Final Effluent and Storm Pipeline together with a right to enter on to the land for the purposes of exercising the rights;\nlocate, install and inspect chambers, valves or manholes within or on the land;\nremove fences or walls within the land during any period during which construction, maintenance, repair or renewal is being carried out (subject to erection of any temporary stock-proof fencing as is reasonably required and the re-instating of the original fences or walls following the exercise of the rights);\ninstall, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation, environmental or ecological mitigation works, including temporary works;\ninstall, execute, implement, retain, repair, improve, renew, remove, relocate, fell, trim, lop or plant trees, bushes, woodlands, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such tree, shrubs and landscaping;\ncarry out such works or ancillary works required by a planning permission and/or consent now or to be granted over the land, or in accordance with any necessary licences, including but not limited to water abstraction, water discharge, protected species and/or wildlife; and\ncarry out any Further Works as defined in Schedule 1 of this Order.\n034e, 038c\nFinal Effluent and Storm Pipeline Restrictive Covenant\nAll restrictions necessary over the land to prevent activities which are likely to cause damage or injury to that part of the authorised development comprised within Work No. 31 (referred to as “the Final Effluent and Storm Pipeline”) or to obstruct, interrupt or interfere with the exercise of the Final Effluent and Storm Pipeline Rights, the free flow and passage of final effluent, stormwater and or other material through the Final Effluent and Storm Pipeline, or render access to it more difficult or expensive, including—\nthe building, construction, erection or installation of any permanent or temporary building or structure or any work of any kind requiring foundations, footings or other supporting structures;\nthe withdrawal of lateral or vertical support from the Final Effluent and Storm Pipeline;\nany activities which increase or decrease ground cover or soil levels or change the composition of the land in any manner whatsoever;\nany activities which increase or decrease ground water levels;\nany activities which obstruct the flows or the discharge of water from the pipelines;\nthe undertaking of piling or percussive works, or works of excavation or mining;\nthe planting of trees or shrubs other than shallow rooting shrubs permitted by the undertaker; and\nthe erection, construction, or laying in or upon the land any pipes, wires, cables, conduits, posts, poles, timber, stone or materials or substance (except fences constructed with such gates or openings as may admit of the free exercise of the Final Effluent and Storm Pipeline Rights),\nwithout the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed activities, building, erection, construction or works would not cause damage to the relevant part of the authorised development nor make it materially more difficult to access or maintain the authorised development).\n001a, 004a, 004b, 004c, 004d, 006c\nRising and Gravity Main Diversion Rights\nAll rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of that part of the authorised development comprised within Work No. 17 including to—\ninstall, connect, retain, use, maintain, inspect, alter, adjust, remove, refurbish, repair, reconstruct, replace, improve, test, commission, cleanse, inspect, maintain, protect, manage, remove or render unusable underground pipelines, rising mains, gravity mains and other associated infrastructure including but not limited to Accessories as defined in section 219 of the Water Industry Act 1991, access chambers, shafts, pipework fittings and fixtures, tunnels, air valves, manholes, marker posts, telemetry infrastructure, communication and control infrastructure, monitoring apparatus, chemical storage and dosing plant, chemical dosing pipework, kiosks, local control panels, CCTV cameras and columns, lightning protection infrastructure, signage, and any other works as necessary;\ndecommission existing redundant infrastructure;\nenter, and be on the land and remain with or without plant, vehicles, machinery, apparatus and equipment for all purposes in connection with the authorised development;\npass and re-pass with or without vehicles, plant machinery, apparatus, equipment and materials (and to lay any surface) for all purposes in connection with the authorised development;\nbreak up the surface of the land, make all necessary excavations, and to carry out reinstatement works;\ncarry out diversion works to existing utilities, to alter or relocate existing utilities connections and to make new utilities connections; and\ncarry out any other Further Works as defined in Schedule 1 of this Order.\n019k, 019l, 019n\nRiver Cam rights\nAll rights necessary for the purposes of or incidental to the construction, installation, operation, protection, repair and maintenance of that part of the authorised development comprised within Work No. 32 (Outfall) including to—\ninstall, connect, retain, use, maintain, inspect, alter, adjust, remove, refurbish, repair, reconstruct, replace, improve, test, commission, cleanse, inspect, maintain, protect, manage or render unusable underground outfall pipelines, outfall structure, temporary cofferdam, temporary and permanent piling, river bed and embankment reinforcement works, dredging, scour protection measures, and other associated infrastructure including but not limited to Accessories as defined in section 219 of the Water Industry Act 1991, access chambers, pipework fittings and fixtures, air valves, manholes, marker posts, monitoring apparatus and any other works as necessary;\nenter, and be on the land (which for the avoidance of doubt includes the riverbed and the surface water), and pass and re-pass and remain on the land with or without plant, vehicles (including boats), machinery, apparatus and equipment for all purposes in connection with the authorised development;\nbreak up the riverbed, make all necessary excavations, install and retain piling, and carry out reinstatement works;\ninstall, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation, environmental or ecological mitigation works, including temporary works;\ninstall, execute, implement, retain, repair, improve, renew, remove, relocate, fell, trim, lop or plant trees, bushes, woodlands, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such tree, shrubs and landscaping;\ncarry out such works or ancillary works required by a planning permission and/or consent now or to be granted over the land, or in accordance with any necessary licences, including but not limited to water abstraction, water discharge, protected species and/or wildlife;\nclear the land from obstructions which may interfere with the waterflow and/or damage or displace the scour protection measures; and\ncarry out any Further Works as defined in Schedule 1 to the Order.\n019k, 019l, 019n\nRiver Cam restrictive covenant\nAll restrictions necessary over the land to prevent activities which are likely to cause damage or injury to that part of the authorised development comprised within Work No. 32 (referred to as the “Outfall”), or to obstruct, interrupt or interfere with the free flow and passage of final effluent, stormwater and other material through the Final Effluent and Storm Pipeline and its discharge from it into the river Cam; or render access to it more difficult or expensive, including—\nthe building, construction, erection or installation of any permanent or temporary building or structure or any work of any kind;\nthe laying in the land of any pipes, wires, cables or conduits; and\nthe undertaking of piling or percussive works, or works of excavation or mining,\nwithout the prior consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed activities, building, erection, construction or works would not cause damage to the relevant part of the authorised development).\n002a, 002b, 002c, 003d, 003e, 004a, 004b, 004c, 004d, 005d, 005e, 005f, 005g, 005j, 006b, 006c, 009a, 010a, 011a\nDecommissioning Works Rights\nAll rights necessary for the purposes of or incidental to the carrying out of that part of the authorised development comprised in Work No. 40 (the Decommissioning Existing Cambridge waste water treatment works) to cease its existing operational function and to facilitate the surrender of its current operational permits including to—\ndecommission existing redundant infrastructure; remove pumps; isolate plant; isolate, fill and cap pipework; clean tanks, pipes, screens and other structures, plant and machinery;\nisolate electrical connections;\ndecommission the potable water supply;\nrestrict access to walkways, plant and machinery;\nenter, and be on the land and remain with or without plant, vehicles, machinery, apparatus and equipment for all purposes in connection with the authorised development;\npass and re-pass with or without vehicles, plant machinery, apparatus, equipment and materials (and to lay any surface)for all purposes in connection with the authorised development;\nbreak up the surface of the land, make all necessary excavations, and to carry out reinstatement works;\ncarry out diversion works to existing utilities, to alter or relocate existing utilities connections and to make new utilities connections; and\ncarry out any Further Works as defined in Schedule 1 of this Order.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "Section 219 was amended by paragraph 110 of Schedule 17 to the Communications Act 2003 (c. 21). There are other amendments to section 219 which are not relevant to this Order."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/452/schedule/10",
    "retrieved_at": "2026-10-28T21:17:31.240414+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}