# The Cambridge Waste Water Treatment Plant Relocation Order 2025, Part 1: TERMINAL PUMPING STATION (WORK No. 16)


(1)
Item
(2)
Maximum design parameter
Finished ground level (FGL) (+ or – 0.5m)
9.5m Above Ordnance Datum (AOD)
Invert level (lowest internal point) of incoming sewer
-13.0m AOD (22.5m below FGL)
Depth of terminal pumping station
No deeper than 25.5m below AOD (35m below FGL) including lowest point of piles
Height of terminal pumping station
Up to 11.5m AOD (2m above FGL)
Configuration
Circular 24m external diameter
Maximum flow capacity
7,000 l/s
Overall footprint of terminal pumping station area
65m x 115m

---
Source: https://www.legislation.gov.uk/uksi/2025/452/schedule/14/part/1 (the official version)