# The Cambridge Waste Water Treatment Plant Relocation Order 2025, Part 10: ODOUR CONTROL PLANT (WORK No. 8)


(1) Item
(2) Number
(3) Maximum design parameter
(4) Maximum height
Finished ground level (+ or – 0.5m)
9m AOD
Sludge treatment centre odour control unit 1
1
20m x 10m
Vent stack 25m AOD (16m above FGL)
Sludge treatment centre odour control unit 2
1
20m x 10m
Vent stack 25m AOD (16m above FGL)

---