  "url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-14/part-15",
  "json_url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-14/part-15.json",
  "legislation": "uksi/2025/452",
  "legislation_title": "The Cambridge Waste Water Treatment Plant Relocation Order 2025",
  "legislation_url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025",
  "path": "schedule/14/part/15",
  "kind": "part",
  "number": "15",
  "heading": "GAS HANDLING EQUIPMENT OPTIONS (WORK Nos. 8 and 9)",
  "text": "(1) Item\n(2) Number\n(3) Maximum design parameters\n(4) Maximum height\n(5) Maximum Capacity\nFinished ground level (+ or – 0.5m)\n–\n–\n9m AOD\n–\nGas holder/gas bag (Work No. 8)\n1\n17m diameter\n29m AOD (20m above FGL) including lightning protection\n2,000m3\nFlare stack (Work No. 8)\n1\n24m AOD (15m above FGL)\n2,000m3/hr\nFootprint of biogas storage and operational area (Work No. 8)\n170m x 50m\nFoundation depth\nPiles to a depth of -16m AOD (25m below FGL)\nEITHER\nBiogas upgrading plant (Work No. 9)\n1\n50m x 50m\n21m AOD (12m above FGL)\n1,000m3/hr\nOR\nCombined heat and power (CHP) plant (Work No. 9)\n2 CHP engines\n50m x 50m\n33m AOD (24m above FGL) stack combined with boiler flue (see Part 16 below)\n1.5 MW thermal input per CHP engine (total maximum 3MWth)",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/452/schedule/14/part/15",
    "retrieved_at": "2026-10-28T21:17:31.240414+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}