{
  "url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-14/part-19",
  "json_url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-14/part-19.json",
  "legislation": "uksi/2025/452",
  "legislation_title": "The Cambridge Waste Water Treatment Plant Relocation Order 2025",
  "legislation_url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025",
  "path": "schedule/14/part/19",
  "kind": "part",
  "number": "19",
  "heading": "CONSTRUCTION COMPOUNDS (WORK Nos. 18, 25, 28, 32 and 34)",
  "text": "(1) Item\n(2) Maximum design parameter\nExisting Cambridge waste water treatment plant tunnel interception shaft (shaft 1)/pipe jack reception shaft (shaft 2) (Work Nos. 18 and 25)\n60m x 130m\nPipe jack intermediate shaft 3 (Work No. 28)\n64m x 60m\nPipe jack intermediate shaft 4 (Work No. 28)\n64m x 60m\nPipe jack intermediate shaft 5 (Work No. 28)\n64m x 60m\nRiverside compound for treated effluent discharge point (Work No. 32)\n40m x 25m\nWaterbeach Primary Compound located at the North end of the pipeline (Work No. 34)\n100m x 100m\nAdditional transient compounds along the Waterbeach pipeline at 1km spacing between the Main Construction Compound and the Primary Compound (Work No. 34)\n80m x 20m",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/452/schedule/14/part/19",
    "retrieved_at": "2026-10-28T21:17:31.240414+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}