# The Cambridge Waste Water Treatment Plant Relocation Order 2025, Part 19: CONSTRUCTION COMPOUNDS (WORK Nos. 18, 25, 28, 32 and 34)


(1) Item
(2) Maximum design parameter
Existing Cambridge waste water treatment plant tunnel interception shaft (shaft 1)/pipe jack reception shaft (shaft 2) (Work Nos. 18 and 25)
60m x 130m
Pipe jack intermediate shaft 3 (Work No. 28)
64m x 60m
Pipe jack intermediate shaft 4 (Work No. 28)
64m x 60m
Pipe jack intermediate shaft 5 (Work No. 28)
64m x 60m
Riverside compound for treated effluent discharge point (Work No. 32)
40m x 25m
Waterbeach Primary Compound located at the North end of the pipeline (Work No. 34)
100m x 100m
Additional transient compounds along the Waterbeach pipeline at 1km spacing between the Main Construction Compound and the Primary Compound (Work No. 34)
80m x 20m

---
Source: https://www.legislation.gov.uk/uksi/2025/452/schedule/14/part/19 (the official version)
Page: https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-14/part-19
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.