# The Cambridge Waste Water Treatment Plant Relocation Order 2025, Part 22: SOLAR INSTALLATION (WORK Nos. 7, 15 and 19)


(1) Item
(2) Maximum area
(3) Minimum area
Total solar installation
7.0 Hectares
0.0 Hectares

---