# The Cambridge Waste Water Treatment Plant Relocation Order 2025, Part 23: HEIGHTS OF SLIM STRUCTURES NOT INCLUDED IN OTHER PARTS


(1) Item
(2) Height
(3) Existing and finished Ground level (+ or – 0.5m)
Heights of crane jibs during construction (all Work Nos.)
50m above existing ground level equating to 60.0m AOD
No greater than 10.0m AOD
Lighting columns (Work Nos. 2, 3 and further works)
15m AOD (5m above FGL)
No greater than 10.0m AOD

---