(1) Item
(2) Maximum design parameter
Finished ground level (+ or – 0.5m)
9.5m AOD
Depth of filtration plant
4.5m AOD (5m below FGL)
Foundation depth
-15.5m AOD (25m below FGL)
Height of filtration plant
19.5m AOD (10m above FGL)
Ferric dosing plant area
20m x 12m
Ferric dosing plant: height
17m AOD (7.5m above FGL)
Overall footprint of tertiary treatment plant
60m x 40m

---