# The Cambridge Waste Water Treatment Plant Relocation Order 2025, Paragraph 108


In this Part of this Schedule—
“river work” means any works forming part of the authorised development which are in or over the river Cam or which require interference with the movement of river traffic on the river Cam;
“temporary river work” means those river works which are temporary in nature and which do not form part of the permanent works in or over the river Cam.

---
Source: https://www.legislation.gov.uk/uksi/2025/452/schedule/15/paragraph/108 (the official version)
Page: https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-15/paragraph-108
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

