# The Cambridge Waste Water Treatment Plant Relocation Order 2025, Paragraph 126: Apparatus of Cambridge Water


The undertaker must not interfere with, build over or build within 6 metres of any apparatus within the Order land or execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus or execute any filling around the apparatus (where the apparatus is laid in a trench) within the standard protection strips unless otherwise agreed in writing with Cambridge Water.

---