# The Cambridge Waste Water Treatment Plant Relocation Order 2025, Paragraph 130: Acquisition of land


Where the undertaker is notifying Cambridge Water of any proposed works under this Part of this Schedule then unless otherwise agreed between the parties, the following will be provided to Cambridge Water—
(a) the exact position of the works;
(b) the level at which they are proposed to be constructed, renewed or moved;
(c) the manner of their construction or renewal including details of excavation and positioning of plant;
(d) the position of all apparatus including existing apparatus and apparatus to be retained;
(e) detailed drawings showing the alterations proposed to the apparatus; and
(f) any maintenance required.

---
Source: https://www.legislation.gov.uk/uksi/2025/452/schedule/15/paragraph/130 (the official version)
Page: https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-15/paragraph-130
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.