# The Cambridge Waste Water Treatment Plant Relocation Order 2025, Schedule 18: CERTIFICATION OF PLANS AND DOCUMENTS


(1) Document/Plan
(2) Document Number
(3) Document date/plan number with revision number
The access and traffic regulation order plans
Key Plan
Sheet 1
Sheet 2
Sheet 3
Sheet 4
Sheet 5
Sheet 6
Sheet 7
Sheet 8
Sheet 9
Sheet 10
4.7
4.7.0
4.7.1
4.7.2
4.7.3
4.7.4
4.7.5
4.7.6
4.7.7
4.7.8
4.7.9
4.7.10
00001-100006-CAMEST-ZZZ-LAY-Z-9050-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9051-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9052-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9053-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9054-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9055-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9056-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9057-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9058-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9059-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9060-Rev C02
Asset management plan
5.4.9.1
September 2023 Revision 03
Biodiversity net gain (BNG) report
5.4.8.13
April 2024 Revision 07
The book of reference
3.3
April 2024 Revision 09
Code of construction practice Part A
5.4.2.1
April 2024 Revision 08
Code of construction practice Part B
5.4.2.2
April 2024 Revision 09
Community liaison plan
7.8
April 2024 Revision 05
Construction workers travel plan
5.4.19.9
April 2023 Revision 02
Construction traffic management plan
5.4.19.7
April 2024 Revision 08
Design and access statement
7.6
October 2023 Revision 03
Design code
7.17
April 2024 Revision 04
Drainage strategy
5.4.20.12
April 2024 Revision 03
The environmental statement
5.1.1 – 5.4
April 2023 subject to the following revisions:
5.1.1
Addendum to the environmental statement – October 2023 Revision 01
5.2.2
Volume 2 Chapter 2 – Project Description – April 2024 – Revision 06
5.2.3
Volume 2 Chapter 3 – Site Selection and Alternatives – September 2023 – Revision 03
5.2.4
Volume 2 Chapter 4 – Consultation – September 2023 – Revision 02
5.2.5
Volume 2 Chapter 5 – EIA Methodology – September 2023 – Revision 02
5.2.6
Volume 2 Chapter 6 – Agricultural Land and Soils – April 2024 – Revision 05
5.2.7
Volume 2 Chapter 7 – Air Quality – April 2024 – Revision 04
5.2.8
Volume 2 Chapter 8 – Biodiversity – April 2024 – Revision 08
5.2.9
Volume 2 Chapter 9 – Climate Resilience – April 2024 -Revision 04
5.2.10
Volume 2 Chapter 10 – Carbon – April 2024 – Revision 06
5.2.11
Volume 2 Chapter 11 – Community – April 2024 – Revision 04
5.2.12
Volume 2 Chapter 12 – Health – April 2024 – Revision 04
5.2.13
Volume 2 Chapter 13 – Historic Environment – April 2024 – Revision 07
5.2.14
Volume 2 Chapter 14 – Land Quality – April 2024 – Revision 05
5.2.15
Volume 2 Chapter 15 – Landscape and Visual Amenity – April 2024 – Revision 05
5.2.16
Volume 2 Chapter 16 – Material Resources Waste – April 2024 – Revision 04
5.2.17
Volume 2 Chapter 17 – Noise and Vibration – April 2024 Revision 06
5.2.18
Volume 2 Chapter 18 – Odour – April 2024 – Revision 04
5.2.19
Volume 2 Chapter 19 – Traffic and Transport – April 2024 – Revision 08
5.2.20
Volume 2 Chapter 20 – Water Resources – April 2024 – Revision 05
5.2.21
Volume 2 Chapter 21 – Major Accidents and Disasters – April 2024 – Revision 06
5.2.22
Volume 2 Chapter 22 – Cumulative Effects – April 2024 – Revision 05
5.3.6
Volume 3 Chapter 6 – Book of Figures – Agricultural Land and Soils – April 2024 – Revision 04
5.3.8
Volume 3 Chapter 8 – Book of Figures – Biodiversity – April 2024 – Revision 04
5.3.11
Volume 3 Chapter 11 – Book of Figures – Community – September 2023 – Revision 02
5.3.13
Volume 3 Chapter 13 – Book of Figures – Historic Environment – September 2023 – Revision 02
5.3.15
Volume 3 Chapter 15 – Book of Figures – Landscape and Visual Amenity – September 2023 – Revision 02
5.3.17
Volume 3 Chapter 17 – Book of Figures – Noise and Vibration – April 2024 – Revision 02
5.3.19
Volume 3 Chapter 19 – Book of Figures – Traffic and Transport – April 2024 – Revision 04
5.4.2.6
Volume 4 Chapter 2 – Mitigation Tracker – April 2024 Revision 05
5.4.2.7
Volume 4 Chapter 2 – Construction Environmental Management Plan – April 2024 Revision 02
5.4.6.1
Volume 4 Chapter 6 – Baseline Agricultural Land Classification – January 2024 Revision 04
5.4.6.2
Volume 4 Chapter 6 – Agricultural Impact Assessment – April 2024 Revision 04
5.4.7.2
Volume 4 Chapter 7 – Dispersion Model Results – September 2023 Revision 02
5.4.8.2
Volume 4 Chapter 8 – Hedgerow Baseline Technical Appendix – April 2024 Revision 03
5.4.8.15
Volume 4 Chapter 8 – Habitats Regulations Assessment Screening Report – December 2023 Revision 04
5.4.8.16
5.4.8.17
Volume 4 Chapter 8 – Habitats Regulations Assessment Report – December 2023 Revision 04
Volume 4 Chapter 8 – Proposed WWTP Arboricultural Impact Assessment
5.4.8.19
Volume 4 Chapter 8 – Waterbeach Pipeline Arboricultural Impact Assessment – November 2023 Revision 03
5.4.8.23
Volume 4 Chapter 8 – Preliminary Environmental Appraisal – January 2024 Revision 02
5.4.10.1
Volume 4 Chapter 10 – GHG Calculations – January 2024 Revision 03
5.4.12.3
Volume 4 Chapter 12 – Mental Wellbeing Impact Assessment (MHWIA) – April 2024 Revision 04
5.4.13.1
Volume 4 Chapter 13 – Historic Environment Baseline Assessment – September 2023 Revision 02
5.4.13.2
Volume 4 Chapter 13 – Gazetteer of Assets – September 2023 Revision 02
5.4.13.3
Volume 4 Chapter 13 – Historic Landscape Characterisation – September 2023 Revision 02
5.4.13.4
Volume 4 Chapter 13 – Historic Environmental Impact Assessment Tables – February 2024 Revision 05
5.4.13.5
Volume 4 Chapter 13 – Geophysical and Trial Trenching Surveys September 2023 Revision 03
5.4.14.1
Volume 4 Chapter 14 – Preliminary Risk Assessment – November 2023 Revision 03
5.4.14.3
Volume 4 Chapter 14 – Geoenvironmental Results – Proposed WWTP – September 2023 Revision 02
5.4.14.4
Volume 4 Chapter 14 – Geoenvironmental Results – Waterbeach – September 2023 Revision 02
5.4.14.6
Volume 4 Chapter 14 – Groundwater Investigation Report Waterbeach – September 2023 Revision 01
5.4.14.7
Volume 4 Chapter 14 – Ground Investigation Report for Cambridge Waste Water Treatment Plant – October 2023 Revision 01
5.4.14.8
Volume 4 Chapter 14 – Ground Investigation Report for Cambridge Waste Water Treatment Plant – Phase B – September 2023 Revision 05
5.4.14.9
Volume 4 Chapter 14 – Preliminary Ground Investigation Factual Report Cambridge WWTP – September 2023 Revision 01
5.4.14.10
Volume 4 Chapter 14 – Geotechnical Interpretative Report – September 2023 Revision 01
5.4.14.11
Volume 4 Chapter 14 – GQRA – February 2024 Revision 01
5.4.15.2
Volume 4 Chapter 15 – Summer and Winter Views – September 2023 Revision 02
5.4.15.3
Volume 4 Chapter 15 – Lighting Assessment Report – September 2023 Revision 02
5.4.17.2
Volume 4 Chapter 17 – Baseline Noise Report – September 2023 Revision 02
5.4.17.3
Volume 4 Chapter 17 – Construction Noise Assessment – April 2024 Revision 02
5.4.17.4
Volume 4 Chapter 17 – Operational Noise Sources – April 2024 – Revision 02
5.4.19.3
Volume 4 Chapter 19 – Transport Assessment – April 2024 Revision 08
5.4.19.4
Volume 4 Chapter 19 – Pedestrian Counts – March 2024 Revision 02
5.4.19.5
Volume 4 Chapter 19 – Traffic Flow Diagrams – March 2024 Revision 03
5.4.19.6
Volume 4 Chapter 19 – Junction Capacity Reports – March 2024 Revision 03
5.4.19.11
Volume 4 Chapter 19 – Road Safety Audit – September 2023 Revision 01
5.4.19.12
Volume 4 Chapter 19 - Comparison of IEMA 1993 and 2023 Guidance – December 2023 Revision 01
5.4.19.13
Volume 4 Chapter 19 –Sensitivity test of a 50% - 50% west-east directional split of construction traffic – December 2023 Revision 01
5.4.19.14
Volume 4 Chapter 19 – Review Note of Chapter 19 Updates Implications for other ES Chapters – April 2024 Revision 01
5.4.20.1
Volume 4 Chapter 20 – Flood Risk Assessment – April 2024 Revision 03
5.4.20.5
Volume 4 Chapter 20 – Fluvial Model Report – April 2024 Revision 05
The hedgerow regulations and tree preservation plans
Key Plan
Sheet 1
Sheet 2
Sheet 3
Sheet 4
Sheet 5
Sheet 6
Sheet 7
Sheet 8
Sheet 9
Sheet 10
4.8
4.8.0
4.8.1
4.8.2
4.8.3
4.8.4
4.8.5
4.8.6
4.8.7
4.8.8
4.8.9
4.8.10
00001-100006-CAMEST-ZZZ-LAY-Z-9820-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9021-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9022-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9023-Rev C03
00001-100006-CAMEST-ZZZ-LAY-Z-9024-Rev C03
00001-100006-CAMEST-ZZZ-LAY-Z-9025-Rev C03
00001-100006-CAMEST-ZZZ-LAY-Z-9026-Rev C03
00001-100006-CAMEST-ZZZ-LAY-Z-9027-Rev C03
00001-100006-CAMEST-ZZZ-LAY-Z-9028-Rev C03
00001-100006-CAMEST-ZZZ-LAY-Z-9029-Rev C03
00001-100006-CAMEST-ZZZ-LAY-Z-9030-Rev C04
Design plans - highways
(Sheet 1) Horningsea Road & proposed WWTP Access Layout Plan;
(Sheet 2) Horningsea Road & Proposed WWTP Access Surface Water Drainage;
(Sheet 3) Horningsea Road Works Cross Sections;
(Sheet 4) Proposed WWTP Entrance and Visitor Car Park Layout Plan;
(Sheet 5) Proposed WWTP Entrance and Visitor Car Park Surface Water Drainage;
(Sheet 6) Horningsea Road & Proposed WWTP Highways authorities area plan;
(Sheet 7) Horningsea Road & Proposed WWTP Proposed Abnormal Indivisible Load (AIL)Vehicle Site Access Routes
4.11
4.11.1
4.11.2
4.11.3
4.11.4
4.11.5
4.11.6
4.11.7
00001-100006-CAMEST-ZZZ-LAY-Z-9808-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9809-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9810-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9811-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9812-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9907-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9900-Rev C03
Framework archaeological investigations mitigation strategy
5.4.13.8
September 2023 Rev 01
The land plans
Key Plan
Sheet 1
Sheet 2
Sheet 3
Sheet 4
Sheet 5
Sheet 6
Sheet 7
Sheet 8
Sheet 9
Sheet 10
4.4
4.4.0
4.4.1
4.4.2
4.4.3
4.4.4
4.4.5
4.4.6
4.4.7
4.4.8
4.4.9
4.4.10
SAV_AW_CAM_DCO_4.4.0_02-Rev 02
SAV_AW_CAM_DCO_4.4.1_01-Rev 01
SAV_AW_CAM_DCO_4.4.2_02-Rev 02
SAV_AW_CAM_DCO_4.4.3_02-Rev 02
SAV_AW_CAM_DCO_4.4.4_01-Rev 01
SAV_AW_CAM_DCO_4.4.5_01-Rev 01
SAV_AW_CAM_DCO_4.4.6_01-Rev 01
SAV_AW_CAM_DCO_4.4.7_02-Rev 02
SAV_AW_CAM_DCO_4.4.8_01-Rev 01
SAV_AW_CAM_DCO_4.4.9_01-Rev 01
SAV_AW_CAM_DCO_4.4.10_02-Rev 02
Landscape, ecological and recreational management plan
5.4.8.14
April 2024 Revision 06
Lighting design strategy
5.4.2.5
April 2024 Revision 05
The rights of way plans
Key Plan
Sheet 1
Sheet 2
Sheet 3
Sheet 4
Sheet 5
Sheet 6
Sheet 7
Sheet 8
Sheet 9
Sheet 10
4.6
4.6.0
4.6.1
4.6.2
4.6.3
4.6.4
4.6.5
4.6.6
4.6.7
4.6.8
4.6.9
4.6.10
00001-100006-CAMEST-ZZZ-LAY-Z-9020-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9011-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9012-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9013-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9014-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9015-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9016-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9017-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9018-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9019-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9821-Rev C02
Sections
design plans- sewer tunnel and longitudinal section;
design plans - outfall
design plans – outfall & effluent storm pipeline plans – final effluent longitudinal section;
design plans – outfall & effluent storm pipeline plans – storm pipeline longitudinal section;
outfall layout plan
design plans - outfall
cross sections;
design plans – outfall river frontage;
design plans – Waterbeach pipeline long sections;
Key Plan
Sheet 1
Sheet 2
Sheet 3
Sheet 4
Sheet 5
Sheet 6
Sheet 7
Sheet 8
Sheet 9
Sheet 10
Sheet 11
Sheet 12
4.12
4.13
4.13.1
4.13.2
4.13.3
4.13.4
4.13.5
4.14
4.14.0
4.14.1
4.14.2
4.14.3
4.14.4
4.14.5
4.14.6
4.14.7
4.14.8
4.14.9
4.14.10
4.14.11
4.14.12
00001-100006-CAMEST-ZZZ-LAY-Z-9807-Rev C01
00001-100006-CAMEST-ZZZ-LON-C-9803-Rev C01
00001-100006-CAMEST-ZZZ-LON-C-9804-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9817-Rev C01
00001-100006-CAMEST-ZZZ-LON-C-9805-Rev C01
00001-100006-CAMEST-ZZZ-LON-C-9806-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9700-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9701-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9702-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9703-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9704-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9705-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9706-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9707-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9708-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9709-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9710-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9711-Rev C01
00001-100006-CAMEST-ZZZ-LAY-Z-9712-Rev C02
Operational workers travel plan
5.4.19.8
April 2024 Revision 05
Odour impact assessment
5.4.18.2
April 2024 Revision 04
Outline commissioning plan
5.4.2.4
January 2024 Revision 03
Outline decommissioning plan
5.4.2.3
April 2024 Revision 05
Outline carbon management plan
5.4.10.2
April 2024 Revision 03
Outline operational logistics traffic plan
5.4.19.10
April 2024 Revision 05
Outline outfall management and monitoring plan
5.4.8.24
April 2024 Revision 05
Outline soil management plan
5.4.6.3
April 2024 Revision 05
Outline water quality monitoring plan
5.4.20.13
April 2024 Revision 04
Preliminary odour management plan
5.4.18.4
September 2023 Revision 03
Wildlife hazard management plan
5.4.8.18
February 2024 Revision 03
The works plans
Key Plan
Sheet 1
Sheet 2
Sheet 3
Sheet 4
Sheet 5
Sheet 6
Sheet 7
Sheet 8
Sheet 9
Sheet 10
Sheet 11
4.3
4.3.0
4.3.1
4.3.2
4.3.3
4.3.4
4.3.5
4.3.6
4.3.7
4.3.8
4.3.9
4.3.10
4.3.11
00001-100006-CAMEST-ZZZ-LAY-Z-9000-Rev C02
00001-100006-CAMEST-ZZZ-LAY-Z-9001-Rev C04
00001-100006-CAMEST-ZZZ-LAY-Z-9002-Rev C04
00001-100006-CAMEST-ZZZ-LAY-Z-9003-Rev C04
00001-100006-CAMEST-ZZZ-LAY-Z-9004-Rev C04
00001-100006-CAMEST-ZZZ-LAY-Z-9005-Rev C04
00001-100006-CAMEST-ZZZ-LAY-Z-9006-Rev C04
00001-100006-CAMEST-ZZZ-LAY-Z-9007-Rev C04
00001-100006-CAMEST-ZZZ-LAY-Z-9008-Rev C04
00001-100006-CAMEST-ZZZ-LAY-Z-9009-Rev C04
00001-100006-CAMEST-ZZZ-LAY-Z-9010-Rev C05
00001-100006-CAMEST-ZZZ-LAY-Z-9818-Rev C04

---
Source: https://www.legislation.gov.uk/uksi/2025/452/schedule/18 (the official version)
Page: https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-18
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

