# The Cambridge Waste Water Treatment Plant Relocation Order 2025, Paragraph 4: Parameters of authorised development


The elements of the authorised development listed in column (1) of the tables in Schedule 14 (parameters) must not exceed the maximum parameters set out for those elements in columns (2), (3), (4) and (5) of those tables as applicable.

---