{
  "url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-9/part-2",
  "json_url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025/schedule-9/part-2.json",
  "legislation": "uksi/2025/452",
  "legislation_title": "The Cambridge Waste Water Treatment Plant Relocation Order 2025",
  "legislation_url": "https://openlegislation.uk/cambridge-waste-water-treatment-plant-relocation-order-2025",
  "path": "schedule/9/part/2",
  "kind": "part",
  "number": "2",
  "heading": "PROHIBITED MOVEMENTS",
  "text": "(1) Location\n(2) Prohibited movement\n(3) Event\nAt the junction of the proposed waste water treatment plant access (Work No. 2) with the B1047 Horningsea Road\nNo right turn from the proposed waste water treatment plant new site access onto the B1047 Horningsea Road northbound at the point shown with a pink circle on sheet 3 of the access and traffic regulation order plans (Document number 4.7.3 as described in column (2) of Schedule 18)\nFrom the date upon which Work No. 2 becomes the operational access to the proposed waste water treatment plant\nAt the junction of the proposed waste water treatment plant access (Work No. 2) with the B1047 Horningsea Road\nNo left turn for HGVs into the proposed waste water treatment plant access from the B1047 Horningsea Road southbound at the point shown with a pink circle on sheet 3 of the access and traffic regulation order plans (Document number 4.7.3 as described in column (2) of Schedule 18)\nFrom the date upon which Work No. 2 becomes the operational access to the proposed waste water treatment plant\nAt the junction of the proposed waste water treatment plant access (Work No. 2) with the B1047 Horningsea Road\nNo right turn into the proposed waste water treatment plant access from the B1047 Horningsea Road northbound at the point shown with a pink circle on sheet 3 of the access and traffic regulation order plans (Document number 4.7.3 as described in column (2) of Schedule 18)\nFrom the date upon which Work No. 2 becomes the operational access to the proposed waste water treatment plant",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/452/schedule/9/part/2",
    "retrieved_at": "2026-10-28T21:17:31.240414+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}