# The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 Confirmation Instrument 2019, Note: Explanatory note


(This note is not part of the Instrument)
This instrument confirms a Scheme to construct over the navigable waters of the River Cam the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct between the Chesterton and the Abbey wards of Cambridge in the said County.
The Secretary of State has modified this Bridge Scheme as follows:
1 In the opening paragraph on page 1 of the Order a closed bracket has been inserted after the words “the Council”.
2 In the Schedule to the Scheme, under “PLANS AND SPECIFICATIONS OF CAMBRIDGE CHESTERTON / ABBEY FOOT / CYCLE BRIDGE (SCHEME 2018)” the “s” has been deleted from “plans” and the word “scheme” within the title of the plan has been amended to “Scheme”. The paragraph has also been amended to accord with the single replacement plan.
3 In the Schedule to the Scheme, the paragraph titled “North Approach – Top of the North Abutment” the word “approximately” has been deleted and the measurement of 40 metres has been amended to 42.23 metres.
4 In the Schedule to the scheme, the paragraph titled “Ditton Meadows Approach – Top of the South Abutment” the word “approximately” has been deleted and the measurement of 30 metres has been amended to 35.79 metres.
5 In the Schedule to the Scheme, the heading “Headroom and Waterway” has been amended to “Headway and Waterway” and the measurements of 24.78m, +7.04m AOD and 109mm have been amended to 28.97m, +7.03m AOD and 3.17m respectively.
6 In the Schedule to the Scheme, the second paragraph under “Overall Dimensions” the measurements of 4.5 metres, 2.64 metres, 2.19 metres and 4.5 metres have been amended to 4.51 metres, 2.69 metres, 2.22 metres and 4.51 metres respectively.
7 In the Schedule to the Scheme, the fourth paragraph under “Overall Dimensions” the word “approximately” has been deleted and the measurements of 88 metres and 77 metres have been amended to 87.60 metres and 81.3 metres respectively.
8 The plans titled “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 – General Arrangement Plan” and “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018 – Longitudinal and Transverse Section” have been replaced by plan Drawing No. 5040126/BR/CB/SK/004 Rev F titled “The Cambridgeshire County Council (Construction of Cambridge Chesterton / Abbey Foot / Cycle Bridge) Scheme 2018”.

---
Source: https://www.legislation.gov.uk/uksi/2019/206/note (the official version)
Page: https://openlegislation.uk/cambridgeshire-county-council-construction-of-cambridge-chesterton-abbey-foot-cycle-bridge-scheme-2018-confirmation-instrument-2019/note
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

