Schedule 1
The works referred to in this Order and shown on the deposited plan marked “The Central Regional Council (Allt Chreagain, Strathyre) Water Order 1987 Plan and Sections of Works” are—
| Work No. 1 | River training works incorporating a weir with crest level 0.3 metres or thereby above general bed level, situated at a point 260 metres or thereby measured in a straight line east-south-east of Creagan House. |
| Work No. 2 | An intake weir with crest level at general bed level or thereby and a gauging chamber incorporating an approved gauge, situated immediately to the north of Work No. 1. |
| Work No. 3 | A chamber with approved gauge connected by a pipe to Work No. 2, and situated adjacent to Work No. 2. |
| Work No. 4 | A discharge pipe, extending 9 metres or thereby in a westerly direction from Work No. 2 to the said tributary of the Allt Chreagain. |