# Channel Tunnel Act 1987, Paragraph


In the borough of Maidstone (parish of Lenham), in the county of Kent—
Work No. 28A—A railway (543 metres in length) on the north side of the railway between London and Ashford, commencing by a junction with that railway at a point 560 metres north-west of the bridge carrying Ham Lane over that railway and terminating by a junction with that railway at a point 18 metres north-west of that bridge:
Work No. 28B—A railway (543 metres in length) on the south side of the railway between London and Ashford, commencing by a junction with that railway at a point 170 metres north-west of the bridge carrying Lenham Road over that railway and terminating by a junction with that railway at a point 365 metres south-east of that bridge:

---
Source: https://www.legislation.gov.uk/ukpga/1987/53/schedule/1/part/III/paragraph/wrapper10n1 (the official version)
Page: https://openlegislation.uk/channel-tunnel-act-1987/schedule-1/part-III/paragraph-wrapper10n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

