# Channel Tunnel Act 1987, Paragraph


In the district of Shepway (parishes of Newington and Saltwood), in the county of Kent—
Work No. 30—A railway (700 metres in length) at Dolland’s Moor, commencing by a junction with the railway between Ashford and Folkestone West at a point 135 metres west of the existing bridge carrying the B2065 over that railway and terminating by a junction with Work No. 1 at its commencement:
Work No. 30A—A railway (1270 metres in length) at Dolland’s Moor, commencing by a junction with the railway between Ashford and Folkestone West at a point 375 metres east of the eastern portal of Saltwood Tunnel and terminating by a junction with Work No. 30 at a point 125 metres from the termination of that work:
Work No. 30B—A railway (558 metres in length), being a deviation of the railway between Ashford and Folkestone West, commencing by a junction with that railway at the said point 135 metres west of the existing bridge carrying the B2065 over that railway and terminating by a junction with that railway at a point 415 metres east of that bridge.

---
Source: https://www.legislation.gov.uk/ukpga/1987/53/schedule/1/part/III/paragraph/wrapper12n1 (the official version)