# Channel Tunnel Act 1987, Paragraph


In the London boroughs of Ealing and Hammersmith and Fulham and the Royal borough of Kensington and Chelsea—
Work No. 25A—A railway (1716 metres in length) at Old Oak Common, commencing in the London borough of Ealing at a point 205 metres south-west of the bridge carrying the railway between Reading and Paddington over the Central Line railway between North Acton and East Acton and terminating in the London borough of Hammersmith and Fulham by a junction with the West London railway, between Mitre Bridge Junction and Kensington Olympia, at a point 3 metres north-west of the bridge carrying that railway over Scrubs Lane, including bridges over the said Central Line and Old Oak Common Lane:
Work No. 25B—A railway (2300 metres in length) at Old Oak Common, commencing in the London borough of Ealing by a junction with Work No. 25A at a point 260 metres east of Old Oak Common Lane, passing through the London borough of Hammersmith and Fulham and terminating in the Royal borough of Kensington and Chelsea at a point 100 metres north-east of the junction of Barlby Gardens with Barlby Road:
Work No. 25C—A railway (290 metres in length) at Old Oak Common, commencing by a junction with the railway between Reading and Paddington at a point 138 metres west of the bridge carrying the said West London railway over that railway and terminating by a junction with the Victoria branch railway at a point 85 metres south-east of the eastern portal of Mitre Tunnel on that railway, including the removal of that tunnel and the substitution of bridges to carry Scrubs Lane and the said West London railway over the said Victoria branch railway:

---
Source: https://www.legislation.gov.uk/ukpga/1987/53/schedule/1/part/III/paragraph/wrapper8n1 (the official version)
Page: https://openlegislation.uk/channel-tunnel-act-1987/schedule-1/part-III/paragraph-wrapper8n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

