# Channel Tunnel Act 1987, Paragraph


In the district of Tandridge (parishes of Bletchingley and Nutfield), in the county of Surrey—
Work No. 26—A railway (1120 metres in length) at Nutfield on the north side of the railway between Redhill and Ashford, commencing by a junction with that railway at a point 63 metres east of the bridge carrying that railway over Coopers Hill Road and terminating by a junction with that railway at a point 20 metres west of the bridge carrying Outwood Lane over that railway:
Work No. 26A—A cut (115 metres in length) at Nutfield forming a diversion of Nutfield Brook, commencing at a point 22 metres north of the southern head-wall of the culvert conducting that stream under the railway between Redhill and Ashford and terminating at a point 98 metres north-east of that point of commencement:

---
Source: https://www.legislation.gov.uk/ukpga/1987/53/schedule/1/part/III/paragraph/wrapper9n1 (the official version)
Page: https://openlegislation.uk/channel-tunnel-act-1987/schedule-1/part-III/paragraph-wrapper9n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

