# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 23A


A railway (1,185 metres in length), being a realignment of the Tilbury Loop Railway, commencing by a junction with that railway at a point 230 metres south-east of the Wennington Branch Sewer where that sewer passes in culvert under that railway, passing south-eastwards in tunnel under the railway (Work No. 23) and terminating by a junction with the Tilbury Loop Railway at a point 240 metres south-west of the point where Tank Hill Road is crossed on the level by the Tilbury Loop Railway;
In the borough of Thurrock, in the county of Essex—

---
Source: https://www.legislation.gov.uk/ukpga/1996/61/schedule/1/crossheading/description-of-works/paragraph/Workn114 (the official version)
Page: https://openlegislation.uk/channel-tunnel-rail-link-act-1996/schedule-1/crossheading-description-of-works/paragraph-Workn114
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

