# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 23C(4)


Diversion of Tank Lane commencing at a point 165 metres north of the bridge carrying Tank Lane over the Tilbury Loop Railway, passing southwards then eastwards along the northern side of Tank Lane, then south-eastwards along the line of that road and terminating at the southern junction roundabout forming part of Work No. 23C(2), at a point 150 metres west of the existing junction of Tank Lane with Botany Way;

---