# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 10P


Diversion of Downs Road commencing in that road at a point 310 metres south-east of its junction with the Hog Lane subway under the A2 (Watling Street), passing south-eastwards and eastwards then southwards over the railways (Works Nos. 10, 11A and 11B) and terminating in Downs Road at a point 330 metres south of the existing junction with that road of the road to Northfleet Green, including bridges over Works Nos. 10, 11A and 11B;

---