# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 10T(3)


A road commencing by a junction with the road (Work No. 10T(1)) at a point 85 metres north-west of the access to the Springhead Nursery from the existing access road on the northern side of the A2, passing south-eastwards on the southern side of Work No. 10T(1), over the railway (Work No. 10) in tunnel, and terminating in the eastbound carriageway of the A2 at a point 250 metres south-east of the bridge carrying Hall Road over the A2;

---