# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 11D


Realignment of the B255 (Hook Green Road), including a bridge over the railway (Work No. 11), commencing in that road at a point 50 metres south-east of its junction with Whitehill Road and terminating in the B255 at a point 190 metres east of the eastern abutment of the existing bridge over the disused railway;

---