Diversion of Water Lane commencing in that road at a point 185 metres north of the northern side of the bridge carrying the M20 over that road, passing south-westwards and southwards under the railway (Work No. 14) and terminating in Water Lane at a point 5 metres north of the southern side of that bridge;

---