# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 16E


A railway (748 metres in length) commencing by a junction with the railway (Work No. 16A) at a point 140 metres north-west of the intended bridge carrying the railway (Work No. 16) over that railway, passing south-eastwards under Work No. 16, on the northern side of Work No. 16A and terminating at a point 92 metres south-east of the eastern side of the existing Aylesford Place level crossing (to be stopped up), including railway sidings;

---