# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 16K


An access road and cycle track commencing in Gasworks Lane at a point 30 metres south of its junction with the A292 (Elwick Road), passing south-westwards for a distance of 108 metres, on the western side of Gasworks Lane (to be stopped up), over the railway (Work No. 16), then continuing as a cycle track south-westwards, then eastwards and westwards, under the railways (Works Nos. 16A, 16B and 16C) and the Tonbridge and Ashford Railway, and terminating in Gasworks Lane at a point 10 metres south of the southern end of the existing bridge carrying that last mentioned railway over that road, including a bridge over Work No. 16;

---
Source: https://www.legislation.gov.uk/ukpga/1996/61/schedule/1/crossheading/description-of-works/paragraph/Workn239 (the official version)
Page: https://openlegislation.uk/channel-tunnel-rail-link-act-1996/schedule-1/crossheading-description-of-works/paragraph-Workn239
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.