# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 16M


A cycle track commencing by a junction with the footpath AU 37 at a point 32 metres south of its junction with the A292 (Elwick Road), passing south-westwards over the railways (Works Nos. 16, 16A, 16B and 16C), the Maidstone and Ashford and the Tonbridge and Ashford Railways, then passing westwards, then eastwards and terminating by a junction with the footpath at a point 5 metres south-west of the southern end of the footbridge carrying that footpath over the Tonbridge and Ashford Railway;

---
Source: https://www.legislation.gov.uk/ukpga/1996/61/schedule/1/crossheading/description-of-works/paragraph/Workn241 (the official version)
Page: https://openlegislation.uk/channel-tunnel-rail-link-act-1996/schedule-1/crossheading-description-of-works/paragraph-Workn241
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

