# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 17C


A new road, forming a diversion of Highfield Lane and Church Road, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying Highfield Lane over that railway, commencing by a junction with Highfield Lane at a point 260 metres north-east of its existing junction with Church Road, passing westwards, then south-westwards and southwards on the eastern side of the existing road, over the two railways, and terminating by a junction with Highfield Lane at a point 40 metres south of the access from that road to The Dean;

---
Source: https://www.legislation.gov.uk/ukpga/1996/61/schedule/1/crossheading/description-of-works/paragraph/Workn253 (the official version)
Page: https://openlegislation.uk/channel-tunnel-rail-link-act-1996/schedule-1/crossheading-description-of-works/paragraph-Workn253
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

