# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 18F


A railway (1,423 metres in length) commencing by a junction with the railway (Work No. 18E) at chainage 150 metres, passing eastwards under the B2065 (Hythe Road) (Work No. 18J), and terminating by a junction with the Eurotunnel Railway at a point 365 metres east of the existing bridge carrying that road over the Dollands Moor Freight Yard;

---