# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 5D


A road commencing by a junction with Work No. 5B at a point 175 metres south-east of its commencement, passing north-eastwards beneath the intended St. Pancras Station (Works Nos. 1A to 1D and 3), across Work No. 5C at a point 7 metres south of its commencement and terminating by a junction with Goods Way at a point 155 metres from the junction of that road with York Way;

---