# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 5EE


A road commencing by a junction with the diverted York Way (Work No. 5Q) at a point 70 metres south of the bridge carrying the North London Line over that road, passing westwards then south-westwards and southwards under the realigned North London Incline Railway (Work No. 1JJ) and the railway (Work No. 1GG) and terminating at a point 150 metres south-east of the existing bridge carrying the North London Line over the Midland Main Line;

---