# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 6E(1)


A railway (410 metres in length), for construction purposes, commencing by a junction with the Lea Valley Line at a point 345 metres south-east of the bridge carrying Lea Bridge Road over that railway, passing eastwards and terminating by a junction with the railway (Work No. 6E) at chainage 1,922 metres;

---