# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 22C


A railway (1,523 metres in length), for construction purposes, commencing by a junction with the Tilbury Loop Railway at a point 166 metres south-east of the bridge carrying Renwick Road over that railway, passing south-eastwards and eastwards, and terminating at a point 38 metres south-west of the point where the new road (Work No. 22H(1)) passes over the railway (Work No. 22B), including railway sidings;

---
Source: https://www.legislation.gov.uk/ukpga/1996/61/schedule/1/crossheading/description-of-works/paragraph/Workn83 (the official version)
Page: https://openlegislation.uk/channel-tunnel-rail-link-act-1996/schedule-1/crossheading-description-of-works/paragraph-Workn83
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

