# Channel Tunnel Rail Link Act 1996, Paragraph Work No. 8L


A railway (301 metres in length) commencing by a junction with the railway (Work No. 8J) at a point 245 metres west of the intended Thames Avenue bridge (Work No. 8R), passing eastwards then southwards and terminating by a junction with a private siding at a point 30 metres north of Lake Road on the western side of Thames Avenue;

---