# The Channel Tunnel Rail Link (Stratford Station and Subsidiary Works) Order 2001, Article 8: Power to acquire land


(1) The Secretary of State may acquire compulsorily so much of the land shown on the deposited plans within the Order limits as may be required for or in connection with the authorised works.
(2) Paragraph (1) above shall not authorise the compulsory acquisition of the land shown as the land numbered 2 in the London Borough of Newham on the deposited plans.
(3) Nothing in paragraph (2) above shall prejudice in any way the power of the Secretary of State to acquire the said land pursuant to section 4 of the principal Act.

---