{
  "url": "https://openlegislation.uk/cheshire-boroughs-of-halton-and-warrington-structural-change-order-1996/article-2",
  "json_url": "https://openlegislation.uk/cheshire-boroughs-of-halton-and-warrington-structural-change-order-1996/article-2.json",
  "legislation": "uksi/1996/1863",
  "legislation_title": "The Cheshire (Boroughs of Halton and Warrington) (Structural Change) Order 1996",
  "legislation_url": "https://openlegislation.uk/cheshire-boroughs-of-halton-and-warrington-structural-change-order-1996",
  "path": "article/2",
  "kind": "article",
  "number": "2",
  "heading": "Interpretation",
  "text": "(1) In this Order—\n“the Act” means the Local Government Act 1992;\n“the 1972 Act” means the Local Government Act 1972;\n“the 1990 Act” means the Town and Country Planning Act 1990;\n“Cheshire” means the non-metropolitan county of Cheshire;\n“the County Council” means the council of Cheshire;\n“Halton”(except in references to the county of Halton) means the borough of Halton and “the Halton Council” means the council of that borough;\n“the relevant date” means 5th May 1997;\n“relevant provision” means a provision in any subordinate legislation made under the Act or made, in connection with the Act or such provision, under any other enactment;\n“the reorganisation date” means 1st April 1998;\n“subordinate legislation” has the same meaning as in section 21 of the Interpretation Act 1978; and\n“Warrington”(except in references to the county of Warrington) means the borough of Warrington and “the Warrington Council” means the council of that borough.\n(2) The period beginning with the relevant date and ending immediately before the reorganisation date is specified as the preliminary period for the purposes of any statutory instrument made under the Act.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "1972 c. 70."
    },
    {
      "type": "footnote",
      "label": "f2",
      "text": "1990 c. 8."
    },
    {
      "type": "footnote",
      "label": "f3",
      "text": "1978 c. 30."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/1996/1863/article/2",
    "retrieved_at": "2026-10-29T12:38:51.890619+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}