# The Cheshire County Council (Forrest Way Bridge, Warrington) Scheme 1986 Confirmation Instrument 1987, Paragraph 6: Construction


The bridge to be a multi span viaduct supported on discrete piers/piles at minimum 20 metre centres across the river channel and floodbanks. No abutments or earthworks shall intrude into the flood area between the flood embankments.

---
Source: https://www.legislation.gov.uk/uksi/1987/544/schedule/2/paragraph/6 (the official version)
Page: https://openlegislation.uk/cheshire-county-council-forrest-way-bridge-warrington-scheme-1986-confirmation-instrument-1987/schedule-2/paragraph-6
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

