Article 2
In this Order:—
(a)
All measurements of distance are measured along the route of the relevant highway:
(b)
“the deposited plan” means the plan numbered HA10/2 WO118 marked “The Chester to Bangor Trunk Road (A55) (Pont Dafydd to Waen Improvement, Detrunking) Order 1996” signed by authority of the Secretary of State for Wales and deposited at the Welsh Office Repository, Curran Embankment, Cardiff.