# The City of Manchester (Bradford Mill Bridge) Scheme 1992 Confirmation Instrument 1992, Schedule: WITH KEY PLAN (PLAN "A'), SITE PLANS (PLANS "B' AND "C') AND ELEVATION (PLAN "D') ATTACHED


From a point south-west of the canal whose co-ordinates are 387246.55E, 398700.37N to a point north-east of the canal whose co-ordinates are 387256.75E, 398715.04N.
CONSTRUCTION
Precast prestressed concrete beams with insitu reinforced concrete slab deck on reinforced concrete abutments faced with brickwork.
SPAN
17.80 metres clear square span (17.869 metres skew span).
WIDTH
7.3 metres single carriageway with 2 No. 3.0 metre footways (13.3 metres overall width).
HEADROOM
3.28 metres minimum headroom over the centre 5 metre width of the canal above the nominal water level of 63.1 metres A.O.D. and 2.67 metres minimum headroom over the canal towpath.
WATERWAY
The existing canal, walls and towpath will be unaltered.

---
Source: https://www.legislation.gov.uk/uksi/1992/1463/schedule/n2 (the official version)
Page: https://openlegislation.uk/city-of-manchester-bradford-mill-bridge-scheme-1992-confirmation-instrument-1992/schedule-n2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.