# The City of Salford (Castlefield Bridge) Scheme 2000 Confirmation Instrument 2001, Part: HEADWAY


Not less than 4.770 metres clear of normal water level of 21.68 metres A.O.D. over a square width of 33.19 metres. (Shipping Headroom requirement.)

---
Source: https://www.legislation.gov.uk/uksi/2001/2932/schedule/2/part/4 (the official version)
Page: https://openlegislation.uk/city-of-salford-castlefield-bridge-scheme-2000-confirmation-instrument-2001/schedule-2/part-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

