# The City of Salford (Castlefield Bridge) Scheme 2000 Confirmation Instrument 2001, Part: WATERWAY


The width of river between existing river retaining walls remains unchanged.
The soffit of bridge deck is above the level 25.050 (100 year flood level + 0.6 metres freeboard—Environment Agency Requirement).

---
Source: https://www.legislation.gov.uk/uksi/2001/2932/schedule/2/part/5 (the official version)
Page: https://openlegislation.uk/city-of-salford-castlefield-bridge-scheme-2000-confirmation-instrument-2001/schedule-2/part-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

