{
  "url": "https://openlegislation.uk/civil-enforcement-of-road-traffic-contraventions-approved-devices-charging-guidelines-and-general-provisions-england-regulations-2022/regulation-11",
  "json_url": "https://openlegislation.uk/civil-enforcement-of-road-traffic-contraventions-approved-devices-charging-guidelines-and-general-provisions-england-regulations-2022/regulation-11.json",
  "legislation": "uksi/2022/71",
  "legislation_title": "The Civil Enforcement of Road Traffic Contraventions (Approved Devices, Charging Guidelines and General Provisions) (England) Regulations 2022",
  "legislation_url": "https://openlegislation.uk/civil-enforcement-of-road-traffic-contraventions-approved-devices-charging-guidelines-and-general-provisions-england-regulations-2022",
  "path": "regulation/11",
  "kind": "regulation",
  "number": "11",
  "heading": "Circumstances in which notification of a penalty charge for a parking contravention on a road in a civil enforcement area may be given otherwise than by fixing a notice to the vehicle",
  "text": "(1) The circumstances specified for the purposes of regulations 9(4)(b) and 10(3)(b) are circumstances where the relevant vehicle is stationary on—\n(a) a bus lane,\n(b) a bus stop clearway or bus stand clearway,\n(c) a carriageway outside a school entrance which is marked in accordance with diagram 1027.1 at item 10 in Part 4 of Schedule 7 to the Traffic Signs Regulations and indicated by the upright sign at item 10 in Part 3 of Schedule 4 to those Regulations,\n(d) a red route, or\n(e) a mandatory cycle lane which is additionally marked in accordance with any of the following diagrams referred to in Part 4 of Schedule 7 to the Traffic Signs Regulations—\n(i) diagram 1018.1 at item 1;\n(ii) diagram 1017 at item 2;\n(iii) diagram 1020.1 at item 3;\n(iv) diagram 1019 at item 4.\n(2) In this regulation—\n“bus lane” means a traffic lane marked in accordance with—\n(a) diagram 1049A at item 11 in Part 6 of Schedule 9 to the Traffic Signs Regulations, and\n(b) the upright sign at diagram 959B at item 10 in Part 4 of Schedule 9 to those Regulations;\n“bus stop clearway or bus stand clearway” means a clearway marked in accordance with diagram 1025.1 at item 9 in Part 4 of Schedule 7 to the Traffic Signs Regulations;\n“mandatory cycle lane” means a cycle lane which is marked in accordance with diagram 1049B at item 7 in Part 6 of Schedule 9 to the Traffic Signs Regulations;\n“red route” means a road marked in accordance with—\n(a) diagram 1018.2 at item 11 or diagram 1017.1 at item 12 in Part 4 of Schedule 7 to the Traffic Signs Regulations, and\n(b) the upright sign at Part 1 of Schedule 6 to those Regulations;\n“the Traffic Signs Regulations” means the Traffic Signs Regulations and General Directions 2016.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Reg. 11 in force at 31.5.2022, see reg. 1(2)"
    },
    {
      "type": "footnote",
      "label": "f1",
      "text": "S.I. 2016/362, to which there are amendments not relevant to these Regulations."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/71/regulation/11",
    "retrieved_at": "2026-10-28T22:04:42.668004+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}