A wind energy electricity generating station with an installed capacity of between 64 and 96MW comprising a nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act consisting of—
Work No. 1 – Up to 32 wind turbines each sited on concrete foundations incorporating hardstanding for cranes, each turbine being fitted with rotating blades and having a height to blade tip of up to 145 metres and including external transformers located at the base of the turbine. The wind turbines comprising Work No. 1 will be situated at the following locations—
Wind turbine number
Grid reference
Easting
Northing
WT 1
301118
358328
WT 2
301550
358106
WT 3
301063
357801
WT 4
300021
357651
WT 5
300510
357483
WT 6
301065
357256
WT 7
300449
357030
WT 8
301282
356957
WT 9
300057
356694
WT 10
301308
356533
WT 11
301151
356100
WT 12
300741
355620
WT 13
301320
355593
WT 14
300957
355275
WT 15
301512
355170
WT 16
301081
354833
WT 17
301599
354551
WT 18
301885
354174
WT 19
302153
353716
WT 20
301561
353647
WT 21
300770
353343
WT 22
301297
353291
WT 23
302358
353159
WT 24
300610
352531
WT 25
301716
352540
WT 26
301193
352528
WT 27
302724
352076
WT 28
300752
352025
WT 29
301198
351850
WT 30
301382
351501
WT 31
300880
350721
WT 32
301232
350505
In Work No. 1, references to the locations of a wind turbine are references to the centre point of that turbine.
Work No. 2A – A series of electrical cables with a nominal voltage of 33 kilovolts together with a cable for the transmission of electronic communications buried beneath the surface of the ground along the general line of the tracks and roads comprised in Work No. 3 and connecting the wind turbines comprising Work No. 1 and the onsite electricity substation comprising Work No. 5A arranged in the following circuit routes—
Cable circuit route number
Commencement point
Termination point
1
Substation forming Work No. 5A
WT1
WT1
WT2
WT2
WT3
WT3
WT4
WT4
WT5
WT5
WT7
WT7
WT9
2
Substation forming Work No. 5A
WT6
WT6
WT8
WT8
WT10
WT10
WT11
WT11
WT12
WT12
WT13
WT13
WT14
3
Substation forming Work No. 5A
WT15
WT15
WT16
WT16
WT17
WT17
WT18
WT18
WT20
WT20
WT21
4
Substation forming Work No. 5A
WT19
WT19
WT22
WT22
WT23
WT23
WT24
WT24
WT26
WT26
WT28
5
Substation forming Work No. 5A
WT25
WT25
WT27
WT27
WT29
WT29
WT30
WT30
WT31
WT31
WT32
Work No. 2B – A series of electrical cables with a nominal voltage of 33 kilovolts together with a cable for the transmission of electronic communications buried beneath the surface of the ground along the general line of the tracks and roads comprised in Work No. 3 and connecting the wind turbines comprising Work No. 1 and the onsite electricity substation comprising Work No. 5B arranged in the following circuit routes—
Cable circuit route number
Commencement point
Termination point
1
Substation forming Work No. 5B
WT24
WT24
WT26
WT26
WT28
WT28
WT30
WT30
WT31
WT31
WT32
2
Substation forming Work No. 5B
WT19
WT19
WT22
WT22
WT23
WT23
WT25
WT25
WT27
WT27
WT29
3
Substation forming Work No. 5B
WT15
WT15
WT16
WT16
WT17
WT17
WT18
WT18
WT20
WT20
WT21
4
Substation forming Work No. 5B
WT6
WT6
WT8
WT8
WT10
WT10
WT11
WT11
WT12
WT12
WT13
WT13
WT14
5
Substation forming Work No. 5B
WT1
WT1
WT2
WT2
WT3
WT3
WT4
WT4
WT5
WT5
WT7
WT7
WT9
Work No. 3 – A series of new tracks, existing tracks subject to improvement and widening, public roads subject to widening and a series of turning heads located adjacent to tracks as described in the following tables—
New tracks
Access track no
Commencement point
Termination point
Easting
Northing
Easting
Northing
N1
301053
354912
301148
354923
N2
301732
353137
301759
353249
N7
300704
357556
301053
357760
N9
300551
354816
300680
354787
N12
301051
357035
301004
356965
N13
300997
356851
301005
356965
N14
301018
355995
301095
355964
N15
300780
355350
300896
355416
N18
301763
352551
301682
352621
N19
301187
352084
301232
351977
N20
300744
358780
300798
358668
N21
299761
357707
299720
357850
N22
300062
357628
299986
357686
N23
301289
352268
301345
352245
N24
301203
352481
301211
352434
N4
301260
351872
301521
351501
N25
300509
357483
300277
357467
N26
300596
357354
300614
357029
N27
301133
355580
300866
355375
N28
300784
355332
300534
355065
New spur tracks
Access track no
Commencement point
Termination point
Easting
Northing
Easting
Northing
S1
301062
358319
301118
358328
S2
301515
358109
301549
358107
S3
301063
357801
301069
357772
S4
300030
357651
300021
357651
S5
300740
357556
300509
357483
S6
301122
357097
301065
357256
S7
300529
356984
300449
357030
S8
301122
357097
301282
356957
S9
300069
356708
300057
356694
S10
301343
356415
301308
356533
S11
301151
356100
301108
355973
S12
300741
355620
300999
355802
S13
301084
355554
301320
355593
S14
300834
355306
300957
355275
S15
301438
355078
301511
355170
S16
301081
354834
301063
354899
S17
301554
354556
301599
354551
S18
301885
354174
301845
354063
S19
301875
353692
302153
353716
S20
301475
353692
301561
353647
S21
300739
353256
300770
353343
S22
301295
353259
301297
353291
S23
302199
353104
302358
353159
S24
300686
352482
300610
352531
S25
301716
352540
301717
352591
S26
301268
352594
301193
352528
S27
302263
351904
302723
352077
S28
300841
352162
300841
352161
S29
301235
351963
301198
351850
S30
301378
351623
301382
351501
S31
301678
350884
300880
350721
S32
301301
350647
301232
350505
SMM1
299997
356584
299893
356575
SMM2
300653
351909
300734
351823
Existing tracks subject to improvement and widening
Access track no
Commencement point
Termination point
Easting
Northing
Easting
Northing
E1
300890
358336
301051
358313
E2
301051
358313
301375
358861
E5
300649
357389
300023
357656
E6
300614
357029
301001
356966
E7
301001
356966
301122
357097
E8
300624
357064
300325
356915
E9
300330
356917
300224
356913
E10
300224
356913
299997
356584
E11
300781
355353
301103
355969
E12
301103
355970
301343
356415
E13
300570
355106
300609
354651
E14
300604
354689
300695
354798
E15
300695
354798
301053
354912
E16
301148
354922
301442
355081
E17
300609
354649
300728
354115
E18
300706
354150
301554
354556
E19
300729
354114
300659
353686
E20
300658
353686
300511
353164
E21
300510
353161
301845
354063
E22
300510
353161
300777
353046
E23
300775
353045
301194
353212
E24
301197
353212
301877
353693
E25
301196
353212
301707
353255
E26
301709
353255
301829
353240
E27
301833
353239
301908
353231
E28
301895
353232
302199
353104
E29
301731
353137
301309
352690
E30
301310
352692
300686
352482
E31
301311
352692
301191
352457
E32
301191
352456
301307
352227
E33
301191
352457
300653
351909
E34
301307
352227
301408
352268
E35
301408
352268
301552
352563
E36
301549
352557
301681
352621
E37
301849
352476
302224
352055
E38
302225
352055
302263
351904
E40
301307
352227
301187
352084
E41
301233
351978
301259
351861
E43
301521
351501
301693
351263
E46
301678
350885
301300
350648
E50
300997
356851
301018
355898
E51
301047
354916
301151
354924
E53
301053
357760
301515
358109
E54
301682
352621
301848
352477
E56
301678
350885
301693
351263
E57
300023
357656
299761
357707
Public roads subject to widening
Public road no
Commencement point
Termination point
Easting
Northing
Easting
Northing
PR1
300744
358778
300624
357351
PR2
300624
357351
300634
357032
PR3
301085
355555
300571
355108
PR5
302454
350166
301749
351092
Turning Heads
Grid reference
Turning head number
Easting
Northing
TH1 (at T3)
301166
357866
TH2 (between T7 and T9)
300226
356920
TH3 (at T10)
301344
356350
TH4 (at T13
301221
355570
TH5 (at T15)
301436
355089
TH6 (at T17)
301501
354506
TH7 (at T18)
301833
354061
TH8 (at T24)
300672
352492
TH9 (at T25)
301854
352484
TH10 (at T28)
300817
352143
TH11 (at T30)
301367
351613
TH12 (at T31)
300989
350791
TH13 (at T32)
301314
350614
In constructing Work No. 3 the undertaker may—
(a)provide temporary passing places for construction vehicles at any location along the line of the work shown on the works plan within the limits of deviation for Work No. 3; and
(b)construct culverts to carry any watercourse under Work No. 3 and extend or replace any existing culvert to carry such a watercourse.
Work No. 4A – A widening of part of the of the unnamed public road shown as PR1 at X on Works Plan 1 to provide construction, maintenance and emergency site access commencing at Ordnance Survey National Grid Reference Point SJ0074458778.
Work No. 4B – A widening of part of the of the unnamed public road shown as PR5 at X on Works Plan 7 to provide construction, maintenance and emergency site access commencing at Ordnance Survey National Grid Reference Point SJ0245550165.
Work No. 5A – An onsite electricity substation comprising an enclosed area of hardstanding of 4080 square metres located at Ordnance Survey National Grid Reference Point SJ0136958813 and including a control building to house switch gear and control equipment.
Work No. 5B – An onsite electricity substation comprising an enclosed area of hardstanding of 4080 square metres located at Ordnance Survey National Grid Reference Point SJ0215150472 and including a control building to house switch gear and control equipment.
Work No. 6 – A meteorological mast for the purpose of monitoring and recording wind speed and direction as well as air temperature, having a height of 100 metres and sited on an area of hardstanding of 900 square metres and located at Ordnance Survey National Grid Reference Point SH9989356575. Work No. 6 includes a cable for the transmission of electronic communications from wind turbine No. 9 comprised in Work No. 1 along the line of existing track No. E10 and new spur track No. SMM1 comprised in Work No. 3.
Work No. 7 – A meteorological mast for the purpose of monitoring and recording wind speed and direction as well as air temperature, having a height of 100 metres and sited on an area of hardstanding of 900 square metres and located at Ordnance Survey National Grid Reference Point SJ0073551823. Work No. 7 includes a cable for the transmission of electronic communications along the line of existing track No. E33 from its junction with new spur track No. S28 and new spur track No. SMM2 comprised in Work No. 3.
Work No. 8 – A temporary civil construction compound comprising an enclosed area of hardstanding of 2500 square metres located at Ordnance Survey National Grid Reference Point SJ0095558354 and including a temporary office and staff welfare building together with an area for the storage of materials for use in the construction of the authorised development.
Work No. 9 – A temporary civil construction compound comprising an enclosed area of hardstanding of 2500 square metres located at Ordnance Survey National Grid Reference Point SJ0178451133 and including a temporary office and staff welfare building together with an area for the storage of materials for use in the construction of the authorised development.
Work No. 10 – A borrow pit for the extraction of stone to be used in the construction of the authorised development, having an area of 39,200 square metres and a depth of up to 18 metres located at Ordnance Survey National Grid Reference Point SJ0189157562.
Work No. 11 – A borrow pit for the extraction of stone to be used in the construction of the authorised development, having an area of approximately 13,600 square metres and a depth of up to 16 metres located at Ordnance Survey National Grid Reference Point SJ0246654106.
Work No. 12 – A borrow pit for the extraction of stone to be used in the construction of the authorised development, having an area of approximately 18,300 square metres and a depth of up to 20 metres located at Ordnance Survey National Grid Reference Point SJ0185151493.
Work No. 13 – A borrow pit for the extraction of stone to be used in the construction of the authorised development, having an area of approximately 11,300 square metres and a depth of up to 19 metres located at Ordnance Survey National Grid Reference Point SJ0078050630.
Work No. 14A – A temporary electrical compound comprising an enclosed area of hardstanding of 2500 square metres located adjacent to the onsite electricity substation forming Work No. 5A at Ordnance Survey National Grid Reference Point SJ0131558784.
Work No. 14B – A temporary electrical compound comprising an enclosed area of hardstanding of 2500 square metres located adjacent to the onsite electricity substation forming Work No. 5B at Ordnance Survey National Grid Reference Point SJ0219750429.

---
Source: https://www.legislation.gov.uk/uksi/2014/2441/schedule/1/part/1 (the official version)
Page: https://openlegislation.uk/clocaenog-forest-wind-farm-order-2014/schedule-1/part-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.