{
  "url": "https://openlegislation.uk/comhairle-nan-eilean-siar-aird-mhor-barra-harbour-empowerment-order-2001/schedule-2",
  "json_url": "https://openlegislation.uk/comhairle-nan-eilean-siar-aird-mhor-barra-harbour-empowerment-order-2001/schedule-2.json",
  "legislation": "ssi/2001/262",
  "legislation_title": "The Comhairle nan Eilean Siar (Aird Mhor, Barra) Harbour Empowerment Order 2001",
  "legislation_url": "https://openlegislation.uk/comhairle-nan-eilean-siar-aird-mhor-barra-harbour-empowerment-order-2001",
  "path": "schedule/2",
  "kind": "schedule",
  "number": "2",
  "heading": "WORKS",
  "text": "Work No. 1. A rubble mound breakwater, protected on its external faces by rock armour, commencing at reference point NF 072088 803889, curving for a distance of 150 metres in a generally east-north-easterly direction and then in a generally south-easterly direction and terminating at reference point NF 072227 803857.\nWork No. 2. A slipway consisting of a reinforced concrete slab over rock fill on the bed of the sea, protected on its south face by rock armour and on its north face by a vertical concrete face, and a timber alignment structure, commencing at reference point NF 072119 803821 extending in a generally easterly direction for a distance of 97 metres and terminating at reference point NF 072216 803811.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ssi/2001/262/schedule/2",
    "retrieved_at": "2026-10-28T22:45:48.027970+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}