Part A
- 1Management options for land set aside from production
- 2The sown green cover option
- 3The natural regeneration option
- 4The wild bird cover option
- 5The under 10 metre strips option
- 6Cutting or destruction of the green cover
- 7Exemptions from the requirement to establish a green cover on set-aside land
- 8Exemptions from the requirement to maintain a green cover on the land set aside from production