# Construction (Health, Safety and Welfare) Regulations (Northern Ireland) 1996, Schedule 7: Places of work requiring inspection


Column 1
Column 2
Place of work
Time of Inspection
1 Any working platform or part thereof or any personal suspension equipment provided pursuant to regulation 6(3)(b) or (c).
1 (i) Before being taken into use for the first time; and
(ii) after any substantial addition, dismantling or other alteration; and
(iii) after any event likely to have affected its strength or stability; and
(iv) at regular intervals not exceeding 7 days since the last inspection.
2 Any excavation which is supported pursuant to regulation 12(1), (2) or (3).
2 (i) Before any person carries out work at the start of every shift; and
(ii) after any event likely to have affected the strength or stability of the excavation or any part thereof; and
(iii) after any accidental fall of rock or earth or other material.
3 Cofferdams and caissons
3 (i) Before any person carries out work at the start of every shift; and
(ii) after any event likely to have affected the strength or stability of the cofferdam or caisson or any part thereof.

---
Source: https://www.legislation.gov.uk/nisr/1996/510/schedule/7 (the official version)